Clearwater
A freshly resurfaced pool with a pale pebble finish and travertine coping at sunset in Clearwater, Florida

Pool resurfacing and remodels in Pinellas County

A pool you want to get into again.

01 · The finishes

Plaster, close

Plaster

7 to 10 years

Smooth. The classic bright white, or a colour.

Quartz, close

Quartz

10 to 15 years

Smooth with a fleck. Holds its colour longer than plain plaster.

Pebble, close

Pebble

15 to 20 years

Textured. The finish most people picture when they say resurface.

Three surfaces. You stand on one of them for the next seven to twenty years.

Plaster, quartz and pebble feel different underfoot, and one lasts twice as long as another.

02 · Cost per year

They cost about the same per year.

Divide what each finish costs by how long it lasts.

Plaster

$500 to $1,071

a year, lasting 7 to 10 years

Quartz

$467 to $1,050

a year, lasting 10 to 15 years

Pebble

$475 to $1,000

a year, lasting 15 to 20 years

Within 8% of each other, worked from either end. So price is not the decision. Choose by how it feels underfoot and how often you want to drain the pool.

03 · Time without a pool

Two weeks with no pool.

This is the part nobody selling a resurface brings up.

  1. Day 1

    The water goes

    A pump empties it to the street drain in about six hours.

  2. Days 2 to 4

    The old surface comes off

    Chipped back to sound shell, which is where any hollow spots get found.

  3. Days 5 to 8

    The new finish goes on

    Bond coat, the finish, then tile and coping if they are in the same visit.

  4. Days 9 to 11

    Refill, and the brushing

    The hose runs until it is full, then we brush it twice a day while it cures.

  5. Days 12 to 14

    You swim

    Once the water balances. You get both dates before any money moves.

04 · Your price

Roughly what your resurface will cost

Pick the finish and the pool size, and watch the range move.

RemodelA shelf, steps, lighting, a new shape
1 · The finish

Textured. 15 to 20 years.

2 · The pool
3 · While the pool is empty

Typical range for this pool

$9,500 to $15,000

Pebble finish, medium pool300 to 500 sq ft, typical
$9,500 to $15,000

Typical for a pool in fair condition. Yours is one figure, once we have sounded the shell.

Make this a fixed quote

The finish and the size travel with you. Answer two short questions, add two photos, done.

A wide sun shelf under a few inches of water, stepping down into a deep pool beside travertine coping and planting

A sun shelf is poured while the pool is already drained. That is the only time it is cheap to add one.

05 · Resurface or remodel

One of these comes round again. The other you do once.

A resurface comes round again when the finish wears out. A remodel changes the pool for good.

06 · Finished pools

Three we have finished.

A pool with a wide sun shelf and bench step in bright white plaster, beside travertine coping and planting

Safety Harbor

Plaster resurface and new steps

Bright white, a new bench, ten days drain to refill.

A kidney-shaped pool with a pale grey quartz finish and blue mosaic tile

Palm Harbor

Quartz resurface with new waterline tile

Pale grey quartz, glass mosaic tile, travertine coping.

A rectangular pool with a pale blue pebble finish under a screened lanai

Clearwater

Pebble resurface under a lanai

Pale blue pebble, new coping, twelve days.

Illustrative jobs on this demo. On your site, your own pools, your own streets.

Dana, Owner, Clearwater Pool Renovations

“I sound every shell before I write a number. If it is hollow, you hear it from me first.”

Dana · Owner, Clearwater Pool Renovations · illustrative

Years in Pinellas
Your years in business go here
Google reviews
Your review count and rating appear here from your Business Profile
Florida licence
Your CPC number sits here, on every page
Membership
Your Pool and Hot Tub Alliance membership goes here

07 · Questions

Questions before you drain a pool

What could make the number change after the quote?

Only the shell. If the old surface comes off and there are hollow spots or cracks we could not see, the extra prep is priced before any work continues, and you can stop there.

Can I do tile and coping later?

You can, but it costs more done separately. The waterline tile and coping come off with the old surface, so doing them in the same visit saves the second setup.

Do you also do weekly service?

No. Renovation work only. We can point you to service companies we trust.

Which towns do you take pools in?

Clearwater, Largo, Dunedin, Safety Harbor, Palm Harbor and Belleair. Further out than that, ask. It depends on the drive more than the pool.

What we do

One number for your pool, in writing.

Send two photos and two short answers. One written figure follows, once we have sounded the shell.