Clearwater

Resurfacing · Clearwater, FL

Pool resurfacing

Plaster chalks, quartz thins and pebble loses its grip on the stone. Resurfacing takes the worn finish off, repairs the shell underneath and puts a new one on. What the shell needs is not known until it is empty and dry, which is why the cost page gives a range rather than a price.

What pool resurfacing costs in Clearwater

01 · The work

From drain to refill

  1. 01

    Drain it and look at it dry

    Cracks and hollow spots only show on a dry shell, so anything found changes the number before work starts.

  2. 02

    Take the old finish off

    The worn surface comes back to sound concrete, with a bond coat where the shell needs one.

  3. 03

    Tile and coping, if they are going

    Cheaper now than later, because the pool is already empty and the crew is already here.

  4. 04

    Put the new finish on

    Plaster, quartz or pebble goes on in a single day.

  5. 05

    Fill it without stopping

    The hose runs until it is full, because a pause leaves a ring at the waterline that will not brush out.

02 · Questions

Questions before you drain a pool

How long is the pool out of use?

About two weeks. Three to five days of that is the work and the rest is filling, brushing and getting the chemistry right before anybody swims.

Can it be done without draining the pool?

No. A new finish has to bond to a dry shell, and the repairs it needs are not visible until the water is gone.

How long should a finish last?

Plaster is the shortest of the three and pebble the longest. Water chemistry moves that further than the choice of finish does, and a surface left out of balance will not reach the bottom of its range.

One number for your pool, not a range.

Two photos of the pool and two short answers. We come back the next working day.